Bangor University Pontio Campus

Our package comprises of:
• Ground works and substructures.
• 31m high lift shaft using climbing shutters.
• 160 linear metres and up to 7 m high of reinforced concrete retaining wall cut into existing rock face.
• 7 Levels of reinforced concrete frame.

The contract was challenging needing a work force of almost sixty operatives and supervisory staff.

There will be over 700 metric tonnes of rebar and 6,000m³ of concrete used in construction.

The project costing £27.5m has been funded by the Welsh Government and the European Regional Development Fund. It will house a theatre, studio theatre, cinema, restaurant, bars, a student’s union, teaching and learning spaces kitted out with the latest technology.

Our Contract Value is £5,000,000

 

Principal Contractor: Miller Construction.

 

Architect: Grimshaw
Structural Engineer: Atkins Ltd