<?xml version="1.0" encoding="iso-8859-1" ?>
<rss version="2.0" xmlns:media="http://search.yahoo.com/mrss">
<channel>
<title>Adana Construction</title>
<link>http://www.adana.com/news.asp</link>
<pubDate>Thu, 18 Mar 2010 00:44:59 GMT</pubDate>
<item>
<title>Adana Construction receive ISG's  Health & Safety Award for December 2009</title>
<link>http://www.adana.com/?NewsID=105</link>
<description><![CDATA[<p>Adana Construction were awarded ISG's December's "Health and Safety League Certificate"&nbsp;at&nbsp;Manchester 6th Form College project.&nbsp; Tim Brice Construction Manager at ISG congratulated the Adana Construction site team,&nbsp;Tim Richards Site Manager, Martin Maloney General Foreman, Robin O'Mahoney Site Engineer and all the Adana workforce.</p>
<p>The league table is based on a points system taking into account, Safe Working Practices, use of Personal Protective Equipment (PPE), Method Statements, Risk Assessments, Quality and Workmanship, Good House Keeping, Standard of Supervision, Toolbox Talks and the&nbsp;Safety Card System.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></description>
<pubDate>Tue, 19 Jan 2010 14:29:27 GMT</pubDate>
</item>
<item>
<title>Adana Office and Site Staff Meeting</title>
<link>http://www.adana.com/?NewsID=103</link>
<description><![CDATA[<p>On Saturday 12th December 2009 Adana Construction held an Office and Site Staff Meeting at its offices in Hillgate Stockport. Joe Jassim Managing Director opened the meeting welcoming all the staff.&nbsp; The Agenda included, Health &amp; Safety, Achilles Accreditation - Building Confidence, &nbsp;Investors in People (IIP),&nbsp;Quality, Procedures,&nbsp;Plant &amp; Material, QS Matters, Company Vehicles, Web Site &amp; Marketing Material, Clients, Current &amp; Future Work for the Company.&nbsp;<br /><br />Within Health &amp; Safety&nbsp;the wearing of safety glasses on sites was discussed.&nbsp;&nbsp;On Bovis Lend Lease and our&nbsp;new client ISG Regions sites&nbsp;it is mandatory to wear safety glasses.&nbsp; To maintain consistency on all&nbsp;Adana sites, from 4th January 2010 it will be Adana Company policy for all Adana Staff and Operatives to wear safety glasses.</p>
<p>Adana Construction committed to investors in people (IIP) a number of years ago.&nbsp; Its managers have just completed six IIP workshops and started site operative appraisals.&nbsp;&nbsp;Adana Construction has applied for&nbsp;IIP&nbsp;recognition and it is planned for the assessment process to take place in February 2010.</p>
<p>Joe Jassim said the future work load for the Company&nbsp;looks promising and thanked everyone for their hard efforts and contributions.</p>
<p>&nbsp;The meeting was very positive and it was agreed to hold meetings at least twice a year.</p>
]]></description>
<pubDate>Sun, 13 Dec 2009 15:41:50 GMT</pubDate>
</item>
<item>
<title>ISG  PLC awards Adana a Contract at Wythenshawe New 6th Form College</title>
<link>http://www.adana.com/?NewsID=102</link>
<description><![CDATA[<p>ISG PLC awarded Adana Construction&nbsp; a contract at Wythenshawe's&nbsp;New&nbsp;6th Form college.&nbsp;The initial package includes,&nbsp; Phase 1&nbsp; substructures and ground floor slab.&nbsp; Phase 2 enabling works consisting of a 900mm dia. and 525 mm dia. culvert diversion and construction of access road and car parking for the site compound.&nbsp; Work is due to start on Monday 2nd November 2009.</p>
<p>ISG are a new client of Adana Construction.</p>
]]></description>
<pubDate>Fri, 30 Oct 2009 10:53:40 GMT</pubDate>
</item>
<item>
<title>Winton Wanderers Community Project</title>
<link>http://www.adana.com/?NewsID=101</link>
<description><![CDATA[<p>Adana Construction took part in this years Bovis Lend Lease (BLL)&nbsp;Community Project at Winton Wanderers, Cranbrook Road, Eccles.</p>
<p>Adana stripped topsoil and vegetation and formed a 1400sq. m. stoned hardstand car park.&nbsp; Adana donated labour plant and materials for the project.&nbsp; Work started on Monday 21st September and took 5 days to complete.&nbsp;</p>
<p>Judith Gonzalez-Bravo of Bovis Lend Lease is a Committee member of the Alder Park Tennants and Residents Association and was the initiator of this years&nbsp;community project.</p>
<p>Joe Jassim of Adana and Ed Venon&nbsp;of Bovis Lend Lease went to Winton Wanders&nbsp;to see the completed works on Friday 25th September and met&nbsp;Paul Doyle&nbsp;Chairman / coach and John Pooley committee member of Winton Wanders.&nbsp; Paul Doyle and John Dooley were very appreciative of all the hard work that has been done to help the local community.</p>
<p>On the photo from the left, Shaun Lappin BLL, Joe Krekoor Adana, Ed Vernon BLL , Joe Jassim Adana, Judith Gonzalez-Bravo BLL and community member, David Lamb Alder Park Residents Association, John Pooley and Paul Doyle of Winton Wanderers.</p>
]]></description>
<pubDate>Fri, 25 Sep 2009 13:03:42 GMT</pubDate>
</item>
<item>
<title>Building Confidence</title>
<link>http://www.adana.com/?NewsID=48</link>
<description><![CDATA[<p><span style="font-size: x-small; font-family: helvetica;">Adana Construction has successfully achieved Building Confidence accreditation standard, having completed an online pre-qualification questionnaire and been subject to a two-day office audit.</span></p>
<p><span style="font-size: x-small; font-family: helvetica;">The Building Confidence accreditation programme has been developed by founder member Bovis Lend Lease in partnership with Achilles Information Ltd.&nbsp; The programme is designed to assess the construction industry supply chain in safety, environmental, sustainability, quality, occupational health and financial areas.</span></p>
<p><span style="font-size: x-small; font-family: helvetica;">The accreditation programme gives confidence that&nbsp;&nbsp;Bovis Lend Lease and Shepherd Construction are using a fair, open and transparent process for contractor selection.&nbsp; It allowed us to:</span></p>
<ul>
<li><span style="font-size: x-small; font-family: helvetica;">Demonstrate our commitment and capability to meet new standards</span></li>
<li><span style="font-size: x-small; font-family: helvetica;">Receive a cost-effective review of our management systems</span></li>
<li><span style="font-size: x-small; font-family: helvetica;">Ensure our business meets the needs of Bovis Lend Lease and the wider construction industry</span></li>
<li><span style="font-size: x-small; font-family: helvetica;">Work with Bovis Lend Lease and Achilles to identify areas of improvement</span></li>
</ul>
<p><span style="font-size: x-small; font-family: helvetica;">&nbsp;</span></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><span style="font-size: x-small; font-family: Helvetica;">.</span></p>
]]></description>
<pubDate>Thu, 24 Sep 2009 10:26:21 GMT</pubDate>
</item>
<item>
<title>Adana / Bovis Golf Day</title>
<link>http://www.adana.com/?NewsID=96</link>
<description><![CDATA[<p>Adana Construction invited Bovis Lend Lease to a Golf Day at Sale Golf Club. &nbsp;On the day the&nbsp;weather was fine at the 18 hole golf course.</p>
<p>After a competitive afternoon Joe Jassim Managing Director of Adana awarded prizes to:-</p>
<p>Stuart Savage of Bovis Lend Lease for the best individual Golfer.<br />Marcus Picken of Bovis Lend Lease for the Longest drive.<br />Edward Vernon Of Bovis Lend Lease for nearest to the pin.</p>
<p>The best Group prize went to <br />Joe Jassim Adana Construction<br />Stuart Savage Bovis Lend Lease<br />Steve Taylor Bovis Lend Lease <br />Ismael Mury Adana Construction</p>
<p>It was a very enjoyable event and a good time was had by all.</p>
]]></description>
<pubDate>Tue, 4 Aug 2009 15:20:03 GMT</pubDate>
</item>
<item>
<title>Successful Completion of Burnley New College</title>
<link>http://www.adana.com/?NewsID=94</link>
<description><![CDATA[<p>&nbsp;</p>
<p>Shepherd Construction achieved Practical Completion (PC) at Burnley New College on contract PC date of &nbsp;3<sup>rd</sup> July 2009.<br />John Smith Principal of Burnley College said to Derek Urquhart Construction Manager and Mark Richardson Project Manager of Shepherd Construction, &lsquo;You have exceeded our expectations and our expectations were very high.'<br /><br />Mark Richardson SCL thanked Adana Construction for all the hard work and team effort &nbsp;that Adana have given over the past 18 months &nbsp;to help successfully complete the project.</p>
<p>&nbsp;This 25,600 m<sup>2</sup>&nbsp;campus consists of a stepped 6 storey building, multi-use sports hall, all weather sports pitches, hard and soft landscaping.<br /><br />The contract started in November 2007 with the site set up and Adana's works included constructing the proposed car park&nbsp;for site car parking.&nbsp; Working alongside the piling contractor Adana excavated, cropped the piles, cast the pile caps and ground beams.&nbsp;&nbsp;Due to the nature of the site Adana constructed a 6m&nbsp;high RC retaining wall on piles with Voltex tanking membrane.&nbsp; As the contract proceeded Adana installed underground drainage and ducting.&nbsp; Adana cast the escalator/ lift&nbsp;pits and the ground floor slabs.&nbsp;&nbsp;During the Contract Adana were awarded the 23,000 m<sup>2</sup> Structural topping package&nbsp;on Bison floor units.<br /><br />The site is split into two with the river Calder flowing down the middle.&nbsp; Adana reconstructed the river wall using the Tensar dry laid system with Geo grid which was also used between the main campus blocks.&nbsp;For access over the river Adana built a road bridge. Next to the all weather pitch Adana installed a Redi - Rock modular retaining wall.<br /><br />Adana completed all the hard landscaping using La Linia paving and street furniture.</p>
<p>&nbsp;Adana's Contract value was &pound;6million.</p>
<p>Architect:&nbsp; DLA Architecture&nbsp; <br />Structural Engineer:&nbsp; White Young Green<br />Landscape Architect:&nbsp; DLA Landscape &amp; Urban Design</p>
]]></description>
<pubDate>Fri, 3 Jul 2009 15:41:49 GMT</pubDate>
</item>
</channel>
</rss>
