This 6-storey, 3,100m² reinforced concrete frame with basement was constructed to an exceptionally high specification overlooking the Rochdale Canal. A sealed sheet-piled cofferdam was installed adjacent to Piccadilly Basin, with 24-hour pumping maintained to create a dry, stable environment for basement construction. Post-tensioned flat slabs span up to 12.5m between columns, reducing reinforcement and delivering flexible open-plan space. Circular and elliptical columns were formed to a premium architectural finish, with blow holes limited to 3mm. A 7m-high feature wall with a textured timber finish was achieved through precise shutter alignment and controlled concreting techniques. The project was shortlisted by The Concrete Society for its outstanding design and quality of finish.
BDP Offices
Location :
Principal Contractor :
Architects :
Structural Engineers :
Services :
Status :
Manchester
Kier Northern
BDP Offices
BDP
Drainage, Concrete Frames, Groundworks
Completed