top of page

This 6-storey, 3,100m² reinforced concrete frame with basement was constructed to an exceptionally high specification overlooking the Rochdale Canal. A sealed sheet-piled cofferdam was installed adjacent to Piccadilly Basin, with 24-hour pumping maintained to create a dry, stable environment for basement construction. Post-tensioned flat slabs span up to 12.5m between columns, reducing reinforcement and delivering flexible open-plan space. Circular and elliptical columns were formed to a premium architectural finish, with blow holes limited to 3mm. A 7m-high feature wall with a textured timber finish was achieved through precise shutter alignment and controlled concreting techniques. The project was shortlisted by The Concrete Society for its outstanding design and quality of finish.

BDP Offices

Location :

Principal Contractor : 

Architects :

Structural Engineers :

Services :

Status :

Manchester

Kier Northern

BDP Offices

BDP

Drainage, Concrete Frames, Groundworks

Completed

© Adana Construction Ltd 2026  |  Registration number: 03907309 

bottom of page