101 Embankment is an 11-storey Grade A office development constructed above a Grade II listed sandstone viaduct in Manchester. The steel-framed building features a two-storey podium and a continuous glazed curtain wall façade, comprising the first phase of the wider Embankment development. Adana Construction’s package involved forming a complex podium foundation cast integrally with the roof slab of an existing concrete basement containing a fully operational car park. Adana’s works also included metal decking installation, in-situ concrete floor construction, full external works package (including drainage, ducting and hard landscaping), and reinstatement of historical features along Cathedral Approach. The project required careful structural integration and coordination due to the heritage constraints and live basement below.
Embankment 101
Location :
Principal Contractor :
Architects :
Structural Engineers :
Services :
Status :
Salford
BAM
Flanagan Lawrence
Curtins Engineers
External Works, Groundworks, Substructure, Metal Deck Flooring
Completed